Turnkey Irrigation for a 360 ha Blueberry Plantation in Serbia
Serbia (Europe)
This is a 360 hectare blueberry plantation in Serbia. ND Project delivered it turnkey, from the first day on bare land to a working irrigation system. We leveled the land, secured the water source, installed the posts for the plantation, and designed, supplied and installed the full irrigation system. At this size, every row needs steady water and even distribution, so the whole project was planned as one.
What we did:
– Land leveling: we prepared the ground so rows, pipes and drainage sit even across the site.
– Water source: we built the pumping stations at the water source, with diesel pump units connected to the main pipeline.
– Post installation: we installed the posts in long straight rows, ready for the plantation and net structure.
– Irrigation: we designed, supplied and installed the system from the pumps to the rows.






